CM at Risk delivery — one accountable team from preconstruction to closeout.

Project team reviewing drawings on a jobsite

01

Construction Manager at Risk

We join early, hold a clear GMP, and own schedule and cost risk with the owner — from preconstruction through closeout, with superintendent-led field accountability. Led by Andrew Hwang.

Aerial view of a commercial site in preconstruction and sitework

02

Preconstruction & constructability

Quantity takeoffs, trade input, site logistics, constructability review, and a schedule that is honest about lead times — while drawings are still moving.

Steel frame of a commercial building under construction

03

GMP & cost / schedule risk management

We build the Guaranteed Maximum Price from trade pricing, name allowances and contingency, and call out long-lead items before commitment. After the GMP is set, cost and schedule are tracked against it and reported to the owner in writing — so risk is managed openly, not discovered late.

Structural steel erection at dusk

04

Trade buyout & subcontractor management

We bid each trade package to qualified subcontractors, level scopes so nothing falls between trades, and buy out against the GMP line by line. Scope gaps get caught at buyout — not in the field.

Close-up of structural steel and concrete finishes

05

Quality & safety

A superintendent on the site every working day, inspections planned ahead of the work, documented quality checks by phase, and a jobsite safety program that is actually run — not just filed.

Completed low-rise commercial building with landscaped walkway

06

Closeout & turnover

Punch lists worked to completion, as-builts, O&M manuals, owner training, and warranties delivered as one organized set — so the owner moves in with the documentation in hand.

Design-build commercial building frame

07

Design-build

We partner with architects and engineers early, hold a target cost, and make the trade-offs in the open before they become change orders.

Ground-up commercial sitework

08

Ground-up commercial

We manage sitework coordination, structure, envelope, and interior build-out as a single point of responsibility.

Tenant improvement office interior

09

Tenant improvement

TI work lives and dies on coordination. We sequence noisy, dusty, and after-hours work so neighboring tenants keep operating.

Brick building under renovation with scaffolding

10

Renovation & adaptive reuse

Selective demolition, structural infill, envelope repair, and new interiors — planned so unknown conditions are priced, not discovered on day forty.

Industrial warehouse interior

11

Industrial & warehouse

Slab flatness, dock equipment, fire and life safety, and a weather-tight shell that lets racking move in on time.